for Veikko Tamlak

** My rogaining maps **

My earli rogaining maps for 24h events
Rogaining Cup 2017
http://rogaining.by/doma/map_images/16.jpg
Winter Rogaining 2016
http://rogaining.by/doma/map_images/4.jpg

** 2018 **

map Pattaya, Thailand
http://rogaining.by/dwl/thai/pattaya-grand-buddha.pdf

Georgia mapmaking
http://rogaining.by/orienteering/sakartvelo/

** 2019 **

Rogaining Cup 2019
My map of last Rogaining event at August, this map based on cartography of others authors by merging anchient maps and my own work.
http://rogaining.by/doma/map_images/32.jpg
Route Gadget of event
http://rg.obelarus.net/cgi-bin/reitti.cgi?act=map&id=339&kieli=

My orienteering map which created at september 2019
http://omaps.obelarus.net/map_images/955.jpg
Route Gadget of event
http://rogaining.by/rg/cgi-bin/reitti.cgi?act=map&id=4
ancient map of this area from a soviet time
http://rogaining.by/wp-content/uploads/2019/09/last-map.jpg

** Examples of my “one day” extrimly fast jobs: **

Rogaining event Vilejka/Narachanka rivers, without fielworks
http://rogaining.by/doma/map_images/33.jpg

Orienteering map about . 3 houres of fieldworks
http://rogaining.by/doma/map_images/24.jpg
You can compare it. Other cartographers loosed a much more time for same territory
http://rogaining.by/wp-content/uploads/2019/11/horodishche.png

Orienteering map of on day of fielworks Epimakhi + one day of a computer works
http://rogaining.by/wp-content/uploads/2019/11/epimakhi-7500.pdf
http://rogaining.by/wp-content/uploads/2019/11/epimakhi-4000.pdf

map for race by marked route without fielworks, the previous map Epimakhi included in it
http://rogaining.by/wp-content/uploads/2019/11/50.pdf

** About your project **

For territory of 35 sq.km. in Georgia I can do
1. make a template by sattelite, Strava, gps traks, soviet military map and buldings from OSM. Roads and paths from OSM is better to redraw.
about 4 days (2-6 days)
2. explore a territory by passing all footpaths at several weeks, may be it takes even a several days depends of your area.
about 10 days (5-15 days)
3. explore a vegetation and countours as much time as you need
more than 5 days
4. during a job I can find best locations for Control Points.
5. I need a time for a computer works
more than 5 days

Mininmum time for a large rogaining map is 12 days
2 days (template) +5 days (minimum fieldworks all paths and partly vegetations) + 5 days (drawing days).
1000-1700 Eurous.
Normal time is 19 days
4 days (template) +10 days (fieldworks for all paths and partly vegetations) + 5 days (drawing days).
2000 Eurous, that is more realable price

If You need more detailed map I can do it
A high detailed orienteering map take 140 working days or more

As options I can do computer works in Georgia
Other option I can devide job for 2 parts. Previouse minimum 2 weeks job at first and more detailed before the event with a marking a Control Points.

Any way You should tell me your area and how many funds you have
.
If you like travelling a lot than you can visit my rogaining event in Belarus (You can donate or just a pay entry fee). We have a region for visitors without visas from EU. You a welcome to Belarus.

Nice Regards.  

etc